Previous Works

Previous Works

126 Items
Installed an On-grid Solar PV system using 6 545W Jinko TIER1 solar panels with 1 Huawei 5kW inverter and participated in the 2022 People's Solar Project.
Preventative Maintenance (PM): On-grid PV system that participated in the 2015 Solar power project. Replacing the inverter with 10kW Huawei and improving the arrangement of the solar cables, checking the electrical system, and cleaning the solar panels.
Installed an On-grid connected system using 18 545 W Jinko TIER1 solar panels with one Huawei 10kW Inverter and join the 2022 People's Solar Project.
Installed an On-grid connected system using 9 Seraphim TIER1 405W solar panels and 2 Jinko TIER1 545W panels with 1 Huawei 10 kW Inverter.
Installed an on-grid system using 68 Jinko TIER1 solar panels, 460W, and using 1 Solar Edge SE27.6K and 34 Power Optimizer P950 devices.
Installed an On-grid system using 9 545W Jinko TIER1 solar panels with 1 Huawei 5 kW inverter.
Installed an On-grid Solar PV system using 6 Jinko TIER1 solar panels of 545W with one Huawei 3kW. Participated in the 2022 People's Solar Project.
Solar panel demolition work and organized the wires around the panel that has been removed. Participated in the 2022 People's Solar Project

OUR PARTNERS

Create a website for free Online Stores