English
ภาษาไทย
English
Menu
HOME
ABOUT US
ABOUT SOLAR CELLS
How solar panels work?
Solar energy Benefits
On-Grid and Off-Grid system
Net Metering
PREVIOUS WORKS
Online Store
CONTACT US
Home
Previous Works
Previous Works
Back
Home
Previous Works
All Category
Previous Works
Search
Previous Works
126 Items
3.27 kWp Residential house (Ploenjai Village 2, Rayong Province)
3.27 kWp Residential house (Ploenjai Village 2, Rayong Province)
Installed an On-Grid system using 6 Jinko TIER1 545 W solar panels with 1 Huawei 3KW 1Ph inverter and participated in the 2022 solar project.
Read More
4.905kWp Residential house (Ban Chang, Pathum Thani province)
4.905kWp Residential house (Ban Chang, Pathum Thani province)
Installed an on-grid system using 9 of 545W Jinko Tier1 solar panels. Using 5kW Solar Edge inverter with 9 of P601 Power Optimizers and applied for permission to sell electricity with the Provincial Electricity Authority.
Read More
4.905kWp Residential House (Chaloem Phrakiat Rama IX Road, Bangkok)
4.905kWp Residential House (Chaloem Phrakiat Rama IX Road, Bangkok)
Installed On-grid system, using 9 545W Jinko TIER1 solar panels with 5kW Huawei 1Ph Inverter. Applied for permission to parallel power with the Metropolitan Electricity Authority.
Read More
4.905kWp Residential house (Vibhavadi 60, Bangkok)
4.905kWp Residential house (Vibhavadi 60, Bangkok)
Installed an on-grid system using 9 Jinko TIER1 545W solar panels and choosing 1 Huawei 5KW 3Ph and participating in the public sector solar project in 2022.
Read More
30.52kWp GPSC CSR Project (Dhammasathan Chaloem Phra Kiat Rama IX, Bangkok)
30.52kWp GPSC CSR Project (Dhammasathan Chaloem Phra Kiat Rama IX, Bangkok)
Installed on-grid system by using 56 Jinko TIER1 545W solar panels and using 1 Solar Edge SE33.3K with 28 Power Optimizer P1100 devices.
Read More
5kWh GPSC and Foundation for Sustainable Power CSR Project (Ban Nakian Hospital, Omkoi, Chiang Mai Province)
5kWh GPSC and Foundation for Sustainable Power CSR Project (Ban Nakian Hospital, Omkoi, Chiang Mai Province)
Installed an off-grid system using 10 Jinko TIER1 545W solar panels and installed a G-Cell(R) solid-state battery pack to support the use of electrical appliances during night time.
Read More
5kWh GPSC and Foundation for Sustainable Power CSR Project (Baan U Tum Hospital, Omkoi, Chiang Mai Province)
5kWh GPSC and Foundation for Sustainable Power CSR Project (Baan U Tum Hospital, Omkoi, Chiang Mai Province)
Installed an off-grid system using 10 Jinko TIER1 545W solar panels and installed a G-Cell(R) solid-state battery pack to support the use of electrical appliances during night time.
Read More
5kWh GPSC and Foundation for Sustainable Power CSR Project (NSO. Ma Ojo, Omkoi, Chiang Mai Province)
5kWh GPSC and Foundation for Sustainable Power CSR Project (NSO. Ma Ojo, Omkoi, Chiang Mai Province)
Installed an off-grid system using six 545W Jinko TIER1 solar panels and a G-Cell(R) solid-state battery pack to support night-time use of electrical appliances.
Read More
«
1
2
3
4
5
6
...
16
»
Go to Page :
Submit
(ทั้งหมด 6 รายการ)
OUR PARTNERS
Create a website for free
By SoGoodWeb.com