Installed an off-grid system using six 545W Jinko TIER1 solar panels and a G-Cell(R) solid-state battery pack to support night-time use of electrical appliances.
Preventative Maintenance (PM) On-grid system at PTT Global Chemical Public Company Limited in the industrial area, Map Ta Phut Industrial Estate, Rayong Province. Remove all dirt on the solar panel of 1,986 solar panels.
Preventative Maintenance (PM) On-grid system at Glow IPP GPSC in Bowin Subdistrict, Si Racha District, Chonburi Province. Removed all dirt on the 1,952 solar panels.
Installed an On-grid system using 11 545W Jinko TIER1 solar panels with one 5kW Huawei inverter. Participated in the 2022 People's Solar Project.
Installed an On-grid system using 6 Jinko TIER1 solar panels [545 W] with one 5 kW Huawei inverter and participated in the 2022 People's Solar Project.
Installed an off-grid PV system using 6 545W Jinko TIER1 solar panels and installed Growatt SPF5000ES with a LifePO4 battery pack. It can be used for lighting systems, fans, and Long distance education systems such as radios, TVs. and etc.
Installed an On-grid PV system using 6 Jinko TIER1 545W solar panels and one 3kW Huawei inverter. Participated in the 2022 People's Solar Project.
Installed an On-grid PV system using 18 545W Jinko TIER1 solar panels, and two 5 kW Huawei Inverters for the solar power project at the General Administrative Building. The project's purpose is to reduce electricity cost during daytime.