9.81kWp Residential (Town in Town, Bangkok)

9.81kWp Residential (Town in Town, Bangkok)

Installed an On-grid connected system using 18 545 W Jinko TIER1 solar panels with one Huawei 10kW Inverter and join the 2022 People's Solar Project.

OUR PARTNERS

Create a website for free Online Stores