• Home

  • Search List Article

Search List Article

  • Home

  • Search List Article

Search List Article

131 Items
Installed on-grid system using 14 405W Seraphim Tier1 solar panels and selected 1 Solar Edge 10kW with 14 Power Optimizer P505
Installed on-grid system using 25 405W Seraphim Tier1 solar panels and selected 1 Solar Edge 10kW with 25 Power Optimizer P505.
Installed on-grid system using 7 405W Seraphim Tier1 solar panels and selected one Solar Edge 5kW with 7 Power Optimizer P505
Off-grid installed using 9 405W Seraphim Tier1 solar panels and 15kWh Lithium Battery to support LED lighting, computers, and power outlets in areas where electricity is not accessible. With a diesel generator as a backup system
Preventative Maintenance (PM) On-grid system participated in the 2015 fire sale project, installed 40 Yingli 250W solar panels by changing the inverter to Solar Edge with 40 Power Optimizer P500.
Installed on-grid system using 56 405W Seraphim Tier1 solar panels and selected one Solar Edge 27.6kW with 28 Power Optimizer P505.
Installed on-grid system using 24 405W Seraphim Tier1 solar panels, one 5kW Solar Edge with 12 Power Optimizer P505 and Huawei 5kW to support future battery connectivity. Ready to apply for permission to parallel the power with the Metropolitan Electricity Authority
The off-grid system was installed using four 405W Seraphim Tier1 solar panels and a 5kWh Lithium Battery to support the use of refrigerators, hanging fans, and LED lighting in areas where electricity is not accessible. With a diesel generator as a backup system

OUR PARTNERS

Create a website for free Online Stores