Home
Previous Works
9.72kWp P.S.N.Machining Ltd., Part (Ban Chang District, Rayong Province)
9.72kWp P.S.N.Machining Ltd., Part (Ban Chang District, Rayong Province)
Home
Previous Works
9.72kWp P.S.N.Machining Ltd., Part (Ban Chang District, Rayong Province)
Installed on-grid system using 24 405W Seraphim Tier1 solar panels and 1 solar Edge 10kW 3 Phase with 24 Power Optimizer P505.